A recurring schedule ran forever. The engine compared weekday and HH:MM and dropped the date
component entirely, so recurrence_end was never read: a campaign set to finish on the 1st was still
switching screens weeks later. The same omission made a recurring schedule live before its start
date.
The calendar does read recurrence_end, so it drew the campaign as finished while the screens kept
obeying it — the two views disagreeing is what made this hard to see from the dashboard. The end
date is offered on the form, so it has to mean something.
The date window is inclusive at both ends: an end date of the 5th means the 5th runs to its normal
end time, which is what someone choosing that date means. An open-ended recurring schedule is
untouched and still runs indefinitely.
NOTE, because this one really does change live screens: any recurring schedule that has been running
past its end date will now stop. That is the intended behaviour and was confirmed before making the
change, but it is the difference between this commit and the calendar fix alongside it, which
changes only what is drawn.
6 tests: stops after the end date, the final day still runs in full, does not run before the start
date, unchanged inside the window, open-ended schedules unaffected, one-offs unaffected.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Uaeo9MvzKoyXuN6ZsbhtkL